UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/30014/D120/T75

Signalling Works Testing Handbook: Siemens Az S 350 U Axle Counter Evaluator System Signalling Works Test Specification

active, Most Current
Buy Now
Organization: NR
Publication Date: 6 September 2014
Status: active
Page Count: 11
scope:

General

This test specification is formed of the following sections, which correlate to the competency levels identified in NR/L2/SIG/30014/B410 for this type of equipment or testing.

1. Inspection and Bonding

2. Cable Test.

3. Wire Count and Continuity

4. Set up and Test

5. Correspondence

General definitions of terms are given in NR/L2/SIG/30014, however terms specific to this specification are defined in the last section of this specification.

Document History

NR/L2/SIG/30014/D120/T75
September 6, 2014
Signalling Works Testing Handbook: Siemens Az S 350 U Axle Counter Evaluator System Signalling Works Test Specification
General This test specification is formed of the following sections, which correlate to the competency levels identified in NR/L2/SIG/30014/B410 for this type of equipment or testing. 1. Inspection...

References

Advertisement