UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/30009/GKRT0041

Signalling Principles Handbook: Track Circuit Block (Former Railway Group Standard GK/RT0041 Issue 1) - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

active, Most Current
Buy Now
Organization: NR
Publication Date: 6 September 2014
Status: active
Page Count: 4
scope:

All requirements contained in GK/RT0041 (issue 1) are to be complied with except those shown in Table 1.

Purpose

As part of the filtering exercise carried out by RSSB, it was found that a number of mandatory requirements contained in GK/RT0041 (issue 1) were out of scope of the Railway Group Standards Code as being single duty holder responsibilities. As a result, the Railway Group Standard was withdrawn by RSSB.

Document History

NR/L2/SIG/30009/GKRT0041
September 6, 2014
Signalling Principles Handbook: Track Circuit Block (Former Railway Group Standard GK/RT0041 Issue 1) - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
All requirements contained in GK/RT0041 (issue 1) are to be complied with except those shown in Table 1. Purpose As part of the filtering exercise carried out by RSSB, it was found that a number of...

References

Advertisement