NAVY - OPNAV 3501.160C CH-2
(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CG 47 (TICONDEROGA) CLASS GUIDED MISSILE CRUISERS
active, Most Current
| Organization: | NAVY |
| Publication Date: | 4 April 2014 |
| Status: | active |
| Page Count: | 80 |
scope:
Purpose. To transmit new pages to enclosure (2), which corrects information in change transmittal 1.
Document History
OPNAV 3501.160C CH-2
April 4, 2014
(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CG 47 (TICONDEROGA) CLASS GUIDED MISSILE CRUISERS
Purpose. To transmit new pages to enclosure (2), which corrects information in change transmittal 1.
April 4, 2014
(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CG 47 (TICONDEROGA) CLASS GUIDED MISSILE CRUISERS
Purpose. To transmit new pages to enclosure (2), which revise capabilities to support reversal of optimal manning initiatives per the Chief of Naval Operations direction.
September 19, 2012
(N96) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR CG 47 (TICONDEROGA) CLASS GUIDED MISSILE CRUISERS
Purpose. This issues the required operational capabilities (ROC) and the projected operational environment (POE) for CG 47 (Ticonderoga) class guided missile cruisers
September 22, 2003
C REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR CG 47 (TICONDEROGA CLASS) GUIDED MISSLE CRUISERS
A description is not available for this item.
July 8, 1994
C REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR CG 47 (TICONDEROGA CLASS) GUIDED MISSLE CRUISERS
A description is not available for this item.