Commissioning Handbook - Substation Control Systems – Stages in Transfer of Control and Testing Requirements

active, Most Current
Buy Now
Organization: NG
Publication Date: 1 November 1998
Status: active
Page Count: 16
scope:

The following generic commissioning on a new, changed or extended SCS is considered.

a) SCS Factory Acceptance Tests

b) SCS Site Acceptance Tests

c) Circuit commissioning Tests

The following staging and transfer arrangements are considered for a new SCS:

a) Replacement of a manned (direct wire control board) site with an SCS controlled from the NGCC.

(i) Phased over a period greater than an outage season.

(ii) Phased over a period less than an outage season.

b) Transfer control of a METRO telecommand site from ROP to NGCC.

(i) Phased over a period greater than an outage season.

(ii) Phased over a period less than an outage season.

c) Transfer from a telecommand METRO at NGCC to an SCS.

(i) Phased over a period greater than an outage season.

(ii) Phased over a period less than an outage season.

Document History

NG CH 11
November 1, 1998
Commissioning Handbook - Substation Control Systems – Stages in Transfer of Control and Testing Requirements
The following generic commissioning on a new, changed or extended SCS is considered. a) SCS Factory Acceptance Tests b) SCS Site Acceptance Tests c) Circuit commissioning Tests The following...