NG TS 3.07.19
National Grid Technical Specifications - Local Control Point Facilities
active, Most Current
Buy Now
| Organization: | NG |
| Publication Date: | 1 July 1995 |
| Status: | active |
| Page Count: | 7 |
scope:
This Specification describes the functional and performance requirements of Local Control Point facilities at NGC substations.
Document History
NG TS 3.07.19
July 1, 1995
National Grid Technical Specifications - Local Control Point Facilities
This Specification describes the functional and performance requirements of Local Control Point facilities at NGC substations.