NG CH 14

Commissioning Handbook - Commissioning of Synchronising Facilities on New Circuit Extensions at Double Busbar Substations

active, Most Current
Buy Now
Organization: NG
Publication Date: 1 February 2002
Status: active
Page Count: 16
scope:

PURPOSE

The purpose of this procedure is to provide a model process for the checks and tests to be performed on a double busbar substation synchronising scheme, when an additional feeder circuit is installed. These are required to ensure that:

• Appropriate checks and tests have been performed on the new synchronising scheme to ensure that it has been correctly installed and is fully functional.

• The new circuitry and equipment provided is compatible with the existing scheme already installed. 

Document History

NG CH 14
February 1, 2002
Commissioning Handbook - Commissioning of Synchronising Facilities on New Circuit Extensions at Double Busbar Substations
PURPOSE The purpose of this procedure is to provide a model process for the checks and tests to be performed on a double busbar substation synchronising scheme, when an additional feeder circuit is...

References