UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/ELP/21088/MOD 13

General Maintenance Parameters for Overhead Line Electrification Equipment: Sunderland Direct Maintenance Parameters

active, Most Current
Buy Now
Organization: NR
Publication Date: 5 December 2015
Status: active
Page Count: 9
scope:

This module of NR/L2/ELP/21088 covers:

a) Equipment Design;

b) Equipment Design Variations;

c) Equipment Design Designations;

d) Environmental Conditions;

e) Maximum Pantograph Operational Speeds;

f) Continuous Current Carrying Capacity;

g) Design Staggers and Deviation;

h) Design Heights;

i) Heel Settings;

j) Track Tolerances;

k) Maximum Dropper Spacing;

l) Conductor Particulars;

m) Conductor Tensions;

n) Factor of Safety.

Document History

NR/L2/ELP/21088/MOD 13
December 5, 2015
General Maintenance Parameters for Overhead Line Electrification Equipment: Sunderland Direct Maintenance Parameters
This module of NR/L2/ELP/21088 covers: a) Equipment Design; b) Equipment Design Variations; c) Equipment Design Designations; d) Environmental Conditions; e) Maximum Pantograph Operational...

References

Advertisement