UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ISA TR77.30.01

Power Plant Control System Dynamic Performance Test Methods and Procedures

active, Most Current
Buy Now
Organization: ISA
Publication Date: 5 July 2015
Status: active
Page Count: 54
scope:

This technical report defines test procedures, data collection requirements and data analysis methods for determining and reporting the dynamic performance of control systems for boiler and turbine control systems on generating units with a rated capacity of 25 MW or greater or a boiler steam flow greater than 25 kg/s (200,000 lb/hr). This technical report covers aspects of dynamic plant operation including constant load operation, normal load ramping operation, grid regulation operation, and response to frequency upset, load runback, and load rundown operation.

Purpose

The purpose of this technical report is to establish dynamic performance criteria for power plant control systems by specifying a consistent means of evaluating control system performance necessary to comply with contractual specifications and other dynamic performance requirements.

Document History

ISA TR77.30.01
July 5, 2015
Power Plant Control System Dynamic Performance Test Methods and Procedures
This technical report defines test procedures, data collection requirements and data analysis methods for determining and reporting the dynamic performance of control systems for boiler and turbine...