IGEM - IGE/GM/8 PART 4

Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar - Part 4 : Operation and maintenance

inactive
Organization: IGEM
Publication Date: 1 January 2006
Status: inactive
Page Count: 43
scope:

These procedures apply to all new onshore gas supply meter installations carrying Natural Gas of flow rate >6 m3h-1 and maximum operating pressure ≤38 bar. It deals with the operation and maintenance of relevant installations. It details:

  • Legal considerations such as Gas Safety (Installation and Use) Regulations and Electricity at Work Regulations.
  • General principles such as work systems, emergency arrangements and maintenance philosophies.
  • Operational checks and tests.
  • Record keeping.

Document History

October 1, 2016
Non-domestic meter installations Part 4 : Operation and Maintenance
This Standard applies to all onshore, gas supply meter installations (hereafter referred to as “installations”) (and defined in IGEM/G/1) of flow rate (capacity) exceeding 6 m3 h-1 and MOPu not...
IGE/GM/8 PART 4
January 1, 2006
Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar - Part 4 : Operation and maintenance
These procedures apply to all new onshore gas supply meter installations carrying Natural Gas of flow rate >6 m3h-1 and maximum operating pressure ≤38 bar. It deals with the operation and maintenance...