IGEM - IGE/GM/8 PART 4
Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar - Part 4 : Operation and maintenance
inactive
| Organization: | IGEM |
| Publication Date: | 1 January 2006 |
| Status: | inactive |
| Page Count: | 43 |
scope:
These procedures apply to all new onshore gas supply meter installations carrying Natural Gas of flow rate >6 m3h-1 and maximum operating pressure ≤38 bar. It deals with the operation and maintenance of relevant installations. It details:
- Legal considerations such as Gas Safety (Installation and Use) Regulations and Electricity at Work Regulations.
- General principles such as work systems, emergency arrangements and maintenance philosophies.
- Operational checks and tests.
- Record keeping.
Document History
October 1, 2016
Non-domestic meter installations Part 4 : Operation and Maintenance
This Standard applies to all onshore, gas supply meter installations (hereafter referred to as “installations”) (and defined in IGEM/G/1) of flow rate (capacity) exceeding 6 m3 h-1 and MOPu not...
IGE/GM/8 PART 4
January 1, 2006
Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar - Part 4 : Operation and maintenance
These procedures apply to all new onshore gas supply meter installations carrying Natural Gas of flow rate >6 m3h-1 and maximum operating pressure ≤38 bar. It deals with the operation and maintenance...