ARMY - UFGS-33 01 30.72
RELINING SEWERS
active, Most Current
Buy Now
| Organization: | ARMY |
| Publication Date: | 1 May 2016 |
| Status: | active |
| Page Count: | 27 |
scope:
NOTE:
This guide specification covers the requirements for storm sewer and sanitary sewer main rehabilitation utilizing pipe within a pipe methods, Fold-and-Form Pipeliner (FFP) and Cured-In-Place Pipe (CIPP).
Document History
May 1, 2016
RELINING SEWERS
NOTE: This guide specification covers the requirements for storm sewer and sanitary sewer main rehabilitation utilizing pipe within a pipe methods, Fold-and-Form Pipeliner (FFP) and Cured-In-Place...
UFGS-33 01 30.72
May 1, 2016
RELINING SEWERS
NOTE:
This guide specification covers the requirements for storm sewer and sanitary sewer main rehabilitation utilizing pipe within a pipe methods, Fold-and-Form Pipeliner (FFP) and Cured-In-Place...