This document references:
MH27.1 - Patented Track Underhung Cranes & Monorail
Published by MHI
on
January 1, 2016
This American National Standard was developed by the Monorail Manufacturers Association, Inc. to assist manufacturers and users of underhung cranes and monorail systems. This standard provides...
This document is referenced by:
CSA B167 - Overhead cranes, gantry cranes, monorails, hoists, and jib cranes
Published by CSA
on
January 1, 2016
This Standard specifies minimum requirements for the design, inspection, testing, maintenance (including modifications and upgrades), and safe operation of a) cranes, including i) overhead travelling...
This document is referenced by:
ASME P30.1 - Planning for Load Handling Activities
Published by ASME
on
December 16, 2019
This Standard establishes planning considerations and practices that apply to load handling equipment (LHE), other associated equipment, and activities when moving loads vertically...
This document is referenced by:
ASME B30.16 - Overhead Underhung and Stationary Hoists
Published by ASME
on
August 31, 2017
The ASME B30 Standard contains provisions that apply to the construction, installation, operation, inspection, testing, maintenance, and use of cranes and other lifting and material-movement related...
This document is referenced by:
ASME B30.22 - Articulating Boom Cranes
Published by ASME
on
June 17, 2016
The ASME B30 Standard contains provisions that apply to the construction, installation, operation, inspection, testing, maintenance, and use of cranes and other lifting and material-movement related...
This document is referenced by:
ASME B30.10 - Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings
Published by ASME
on
November 21, 2019
SCOPE OF ASME B30.10 Volume B30.10 includes provisions that apply to the fabrication, attachment, use, inspection, and maintenance of hooks shown in Chapters 10-1 and 10-2 used for load handling...