UNLIMITED FREE ACCESS TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/TRK/2102

Design and Construction of Track

inactive
Buy Now
Organization: NR
Publication Date: 3 September 2016
Status: inactive
Page Count: 116
scope:

This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 140 mph. This includes:

a. the construction of new sections of track, and routes;

b. the replacement of contiguous lengths of track components or switch and crossing layouts, either singly or in combination, as part of project or renewal activities;

c. the replacement or new construction of trackbed layers, drainage, level crossings, direct fastening systems, buffer stops or other track fixtures;

d. the replacement of components of the track system, carried out during maintenance, that significantly changes its design or configuration (for instance the installation or removal of check rails or the installation of cast crossings with welded extension legs in place of semi-fabricated crossings);

e. the requirements to be met whenever existing tracks are upgraded to carry higher speeds or tonnages of rail traffic; and

f. the requirements for the design of track geometry for both newly installed and existing track.

This standard applies to those who specify, design or supervise the installation of new track and those who design alignments on existing track.

Purpose

This standard is intended to control the risk of incorrect materials and components being specified and to control the required quality of installation of track. It specifies the design principles and minimum standards for the construction of new or relayed track, including the materials to be used. It also specifies acceptance criteria for new or relayed track in terms of workmanship and the track geometry requirements for both newly installed and existing track.

Document History

Design and Construction of Track
This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 125mph. This includes: a. the construction of new sections of track, and...
December 3, 2022
Design and Construction of Track - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 125 mph. This includes: a. the construction of new sections of track, and...
June 5, 2021
Design and Construction of Track
This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 125 mph. This includes: a. the construction of new sections of track, and...
March 6, 2021
Design and Construction of Track
This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 125 mph. This includes: a. the construction of new sections of track, and...
NR/L2/TRK/2102
September 3, 2016
Design and Construction of Track
This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 140 mph. This includes: a. the construction of new sections of track, and...
December 5, 2015
Design and Construction of Track
This Network Rail standard specifies the requirements for the design and construction of track with line speeds up to 140mph. This includes: a. the construction of new sections of track, and routes;...
March 6, 2010
Design and Construction of Track
This Network Rail standard specifies the requirements for the design and construction of track. This includes: a) the construction of new sections of track, and routes; b) the replacement of...
February 2, 2002
Track Construction Standards (aka NR/SP/TRK/102)
This specification applies to all track construction and renewal. For the purposes of this specification "renewal" includes all track relaying or rerailing, but not like-for-like maintenance...
June 1, 2000
Track Construction Standards (aka NR/SP/TRK/102)
This specification applies to all track construction and renewal. For the purposes of this specification renewal includes all track relaying or rerailing, but not like-for-like maintenance...
August 1, 1998
TRACK CONSTRUCTION STANDARDS (aka NR/SP/TRK/102)
This specification applies to all track construction and renewal. For the purposes of this specification "renewal" includes all track relaying or rerailing, but not like-for-like maintenance...
April 1, 1997
TRACK CONSTRUCTION STANDARDS (aka NR/SP/TRK/102)
This specification applies to all track construction and renewal. For the purposes of this specification .renewal. includes all track relaying or rerailing, but not like-for-like maintenance...

References

Advertisement