UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

TIA-102.CABC

Project 25 Interoperability Testing for Voice Operation in Trunked Systems

active, Most Current
Buy Now
Organization: TIA
Publication Date: 1 February 2017
Status: active
Page Count: 88
scope:

INTRODUCTION

This document has been developed with input from the APCO Project 25 Interface Committee (APIC) Compliance Assessment Process and Procedures Task Group (CAPPTG) and the APIC TDMA Task Group. The impetus behind the development of this document is the public safety land-mobile radio industry's and user community's opinion that there is a need for standardized functional interoperability testing of trunked radio equipment designed to the complementing documents that comprise this suite of standards.

The purpose of this document is to define functional procedures for testing the interoperability of subscribers and FNE in trunked voice operation between different manufacturers, different models of the same manufacturer, and different firmware versions of the same model. These tests cover an FDMA control channel working in conjunction with either an FDMA voice channel or a TDMA voice channel.

Document History

May 1, 2022
Project 25 Interoperability Testing for Voice Operation in Trunked Systems Addendum 1- System Call
This addendum is a direct replacement for sub-clauses 2.2.14.3 (“Initial Conditions”) and 2.2.14.4 (“Procedure”) of TIA-102.CABC-C “2.2.14 Test Suite: System Call.” This document will only include...
TIA-102.CABC
February 1, 2017
Project 25 Interoperability Testing for Voice Operation in Trunked Systems
INTRODUCTION This document has been developed with input from the APCO Project 25 Interface Committee (APIC) Compliance Assessment Process and Procedures Task Group (CAPPTG) and the APIC TDMA Task...
July 1, 2011
Project 25 Interoperability Testing for Voice Operation in Trunked Systems Addendum - TDMA Mode
INTRODUCTION This document has been developed with input from the APCO Project 25 Interface Committee (APIC) TDMA Task Group. The impetus behind the development of this document is the public safety...
November 1, 2010
Project 25 Interoperability Testing for Voice Operation in Trunked Systems
SCOPE AND LIMITS OF TESTING Interoperability testing for trunking, as described in this document, is limited to functional operations integral to the performance of voice procedures between...
November 1, 2009
Project 25 Interoperability Testing for Voice Operation in Trunked Systems Addendum - Wide Area Roaming
Scope and Limits of Testing [Modify the existing text in this sub-clause as shown below.] Interoperability testing for trunking, as described in this document, is limited to functional operations...
March 1, 2008
Project 25 Interoperability Testing for Voice Operation in Trunked Systems
INTRODUCTION This document has been developed with input from the APCO Project 25 Interface Committee (APIC) Compliance Assessment Process and Procedures Task Group (CAPPTG). The impetus behind the...
September 1, 2006
Interoperability Testing for Voice Operation in Trunked Systems
A description is not available for this item.

References

Advertisement