UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

DS/EN 50518-1

Monitoring and alarm receiving centre – Part 1: Location and construction requirements

active, Most Current
Buy Now
Organization: DS
Publication Date: 6 December 2013
Status: active
Page Count: 26
ICS Code (Alarm and warning systems): 13.320
scope:

This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by one or more intruder and hold-up alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.This part of EN 50518 is to be read in conjunction with Part 2 and Part 3, and cannot be used separately.

Document History

DS/EN 50518-1
December 6, 2013
Monitoring and alarm receiving centre – Part 1: Location and construction requirements
This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals...
May 31, 2010
Monitoring and alarm receiving centre – Part 1: Location and construction requirements
This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals...
Monitoring and alarm receiving centre -- Part 1: Location and construction requirements
This part of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals...
Monitoring and alarm receiving centre -- Part 1: Location and construction requirements
This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals...
Monitoring and alarm receiving centre -- Part 1: Location and construction requirements
This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals...

References

Advertisement