NR/SMS/PART/D ISSUE 8

Signal Maintenance Specifications (SMS): Level Crossing Annual Test

inactive
Organization: NR
Publication Date: 4 March 2017
Status: inactive
Page Count: 228
scope:

GENERAL

This test plan is the 'Service B Tests' of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant 'tick boxes' by each task so that particular item of the test can be correctly recorded as per the index in 'crossing defects'.

It does not cover AHBC installations controlled by HXP-3 crossing processors The numbering of the sections in this test plan is unique; they do not follow on from the operation sequence test in NR/SMS/Test/070 'Service A Tests'.

To perform the annual test the following documents will be required:

• The crossing ground plan

• The level crossing order

• The crossing control tables

• The signalling plan

Missing documentation shall be listed as a defect.

Document History

June 4, 2022
Signal Maintenance Specifications (SMS): PART D
A description is not available for this item.
September 4, 2021
Signal Maintenance Specifications (SMS): PART D
A description is not available for this item.
December 5, 2020
Signal Maintenance Specifications (SMS): Part D
A description is not available for this item.
March 7, 2020
Signalling Maintenance Specifications (SMS): Part D
A description is not available for this item.
June 1, 2019
Signal Maintenance Specifications (SMS): Part D
A description is not available for this item.
September 1, 2018
Signal Maintenance Specifications (SMS): Part D
GENERAL This test plan is the ‘Service B Tests’ of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes’ by each...
March 3, 2018
Signal Maintenance Specifications (SMS): Level Crossing Annual Test
GENERAL This test plan is the ‘Service B Tests’ of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes’ by each...
NR/SMS/PART/D ISSUE 8
March 4, 2017
Signal Maintenance Specifications (SMS): Level Crossing Annual Test
GENERAL This test plan is the ‘Service B Tests’ of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes’ by each...
March 5, 2016
Signal Maintenance Specifications: Level Crossing Annual Test
GENERAL This test plan is the ‘Service B Tests’ of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes’ by each...
September 6, 2014
Signal Maintenance Specification (SMS): Level Crossing Annual Test
GENERAL This test plan is the ‘Service B Tests' of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes' by each...
December 1, 2009
Level Crossing Annual Tests
GENERAL This test plan is the ‘Service B Tests' of NR/SMS/LC10 and NR/SMS/Test/070. It is for use of the person conducting the annual test of the level crossing and has relevant ‘tick boxes' by each...