UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR TI 172

AC Electrified Lines Traction Bonding - Requirements for Signal Engineering Involvement and Track Circuit Testing

active, Most Current
Buy Now
Organization: NR
Publication Date: 10 August 2012
Status: active
Page Count: 3
scope:

This instruction applies to traction bonding arrangements on a.c. electrified lines where train detection is provided by 

  • d.c. track circuits
  • HVI track circuits 
  • Audio frequency track circuits (e.g.TI21 or EBITrack)
  • axle counters
  • Reed track circuits

For the purposes of this instruction, traction (i.e. "Non-Signalling") bonds include:

  • structure to rail bonds
  • traction rail to rail bonds
  • impedance bond centre plate connections (on all types of track circuits employing impedance bonds).
  • OLE along track conductors, including earth wires, return conductors and associated connections to traction rails
  • Return screening conductors and associated connections to traction rails
  • Red Bonds

"Signalling" traction bonds may be defined as:

  • Yellow bonds
  • Impedance bond side leads (on all types of track circuits employing impedance bonds ) and are outwith the scope of this instruction.

It applies to all maintenance, renewal, and project situations (including stageworks).

Purpose

Clear direction is required that attendance of signalling staff and/or the re-testing of track circuits is not necessary when changes are made to the a.c. OLE (whether Classic or Auto- Transformer) traction return system for electrification purposes, which have no effect on the integrity or operating characteristics of the train detection arrangements.

Document History

NR TI 172
August 10, 2012
AC Electrified Lines Traction Bonding - Requirements for Signal Engineering Involvement and Track Circuit Testing
This instruction applies to traction bonding arrangements on a.c. electrified lines where train detection is provided by  d.c. track circuits HVI track circuits  Audio frequency track circuits...

References

Advertisement