NR/L2/RMVP/0200/P511 ISSUE 2
Infrastructure Plant Manual: Flails and Mulchers
| Organization: | NR |
| Publication Date: | 3 June 2017 |
| Status: | inactive |
| Page Count: | 10 |
scope:
This module defines the requirements for developing a safe system of work for flailing and mulching operations. It includes:
a) requirements to plan all work and to mitigate potential hazards;
b) guidance on selecting the right machine; and
c) requires that a site visit is carried out prior to starting any work.
This module applies to all flailing and mulching operations carried out on Network Rail managed infrastructure (NRMI) and Network Rail projects when using on-track plant or any non-rail mounted mobile plant.
See the index of NR/L2/RMVP/0200 for information on which:
a) specific roles this module applies to; and
b) modules that also apply to those roles.
Purpose
The implementation of this module contributes to mitigating the following risks:
a) failure of plant or its control or safety systems;
b) operating error, operational error or equipment misuse;
c) poor site or weather conditions;
d) incorrect lifting operations (LOLER);
e) lack of RIDDOR or close call reporting; and
f) a lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.