NR/L3/OPS/045/3.11 ISSUE 1
National Operating Procedure (NOP) 3.11: Electrical Isolations AC (OLE)
| Organization: | NR |
| Publication Date: | 2 September 2017 |
| Status: | inactive |
| Page Count: | 9 |
scope:
Network Rail Route Businesses England & Wales and Route Business Scotland staff respond to planned and unplanned events involving the OHL equipment as they are reported and make sure of a timely response and determine the full details and effects of a failure in order to maintain the safety of the operational railway.
This procedure makes sure that any blockage to AC electric trains is effected in a consistent and safe manner.
PURPOSE
This procedure allows both Network Rail's Route Businesses England & Wales and Route Business Scotland staff to safely deal with isolations affecting the overhead line AC system.
Document History