NR/L3/OPS/045/3.21

National Operating Procedure (NOP) 3.21: Asset Monitoring Systems Wheel Impact Load Detector (WILD) and Hot Axle Box Detector (HABD)

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 September 2017
Status: active
Page Count: 8
scope:

This procedure sets out how to:

a) manage defective rail vehicles following the activation of Wheel Impact Load Detector (WILD); and

b) instigate the immediate repair of failed Hot Axle Box Detectors (HABD) and WILD monitoring equipment.

It applies to Network Rail Route Operations Control.

PURPOSE

This procedure reduces the potential risk to the network from rail damage caused by vertical wheel impact forces and failed "Intelligent Infrastructure" monitoring equipment.

Document History

National Operating Procedure (NOP) 3.21: Asset Monitoring Systems Wheel Impact Load Detector (WILD) and Hot Axle Box Detector (HABD)
This procedure sets out how to: a) manage defective rail vehicles following the activation of a Wheel Impact Load Detector (WILD) and Hot Axle Box Detector (HABD); and b) instigate the immediate...
NR/L3/OPS/045/3.21
September 2, 2017
National Operating Procedure (NOP) 3.21: Asset Monitoring Systems Wheel Impact Load Detector (WILD) and Hot Axle Box Detector (HABD)
This procedure sets out how to: a) manage defective rail vehicles following the activation of Wheel Impact Load Detector (WILD); and b) instigate the immediate repair of failed Hot Axle Box...