CENELEC - EN 60909-3

Short-circuit currents in three-phase a.c systems - Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth

inactive
Organization: CENELEC
Publication Date: 1 November 2003
Status: inactive
Page Count: 36
ICS Code (Power transmission and distribution lines): 29.240.20
ICS Code (Electricity. Magnetism. General aspects): 17.220.01

Document History

March 1, 2010
Short-circuit currents in three-phase a.c systems - Part 3: Currents during two separate simultaneous line-to-earth short-circuits and partial short-circuit currents flowing through earth
Scope and object This part of IEC 60909 specifies procedures for calculation of the prospective short-circuit currents with an unbalanced short circuit in high-voltage three-phase a.c. systems...
EN 60909-3
November 1, 2003
Short-circuit currents in three-phase a.c systems - Part 3: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth