UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/ELP/27715/MOD 02

Overhead Contact System Design Specification: Module 2 Allocation Design Principles - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

active, Most Current
Buy Now
Organization: NR
Publication Date: 3 March 2018
Status: active
Page Count: 30
scope:

This module specifies the requirements for OCS allocation design.

This module is applicable to modification of, renewal of, or new railway subsystems that impact on the OCS and, in particular, any work that impacts the integration of the OCS with the corresponding features of other interconnected systems.

This module is applicable to all OCS Designers.

Purpose

The purpose of this module is to specify the Network Rail requirements to meet legislation and to achieve safety, economy and performance when developing the principal features of an Overhead Contact System (OCS), in particular the integration with other interconnected systems.

This module provides a common strategy to demonstrate compliance and optimise the design of railway subsystems, but is not intended to reiterate legislation and governing standards

Document History

Overhead Contact System Design Specification: Module 2 Allocation Design Principles
This module specifies the requirements for OCS allocation design.  This module is applicable to modification of, renewal of, or new railway subsystems that impact on the OCS and, in particular, any...
NR/L2/ELP/27715/MOD 02
March 3, 2018
Overhead Contact System Design Specification: Module 2 Allocation Design Principles - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
This module specifies the requirements for OCS allocation design. This module is applicable to modification of, renewal of, or new railway subsystems that impact on the OCS and, in particular, any...

References

Advertisement