NR/L2/SIG/30014/D120/T-01
Signalling Works Testing Handbook: Operator’s Control / Indication Panel
| Organization: | NR |
| Publication Date: | 3 March 2018 |
| Status: | active |
| Page Count: | 3 |
scope:
General
This test specification is formed of the following sections, which correlate to the competency levels identified in NR/L2/SIG/30014/B410
1. Inspection
2. Wire Count and Continuity Test
3. Check to SP (Scheme Plan)
4. Function Tests
General definitions of terms are given in NR/L2/SIG/30014/E110
Document History