UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ETSI - EN 305 174-1

Access, Terminals, Transmission and Multiplexing (ATTM); Broadband Deployment and Lifecycle Resource Management; Part 1: Overview, common and generic aspects

active, Most Current
Organization: ETSI
Publication Date: 1 February 2018
Status: active
Page Count: 22
scope:

The present document is part 1 of a multi-part deliverable which specifies the general engineering of various broadband infrastructures to enable the most effective energy management (and management of other resources) and the appropriate measures for End-of-Life (EoL) treatment of ICT equipment.

This multi-part deliverable does not address the following aspects of the broadband network sub-systems:

• implications for carbon "footprint";

• resources used to construct the sub-systems;

• the nature or method of production of the energy consumed by the infrastructures.

The present document provides an overview of the ETSI EN 305 174 series of standards together with a definition of the common and generic aspects to which the other standards in the series conform.

Clause 2 and clause 3 contain references, definitions, symbols and abbreviations which relate to this part; similar information will be included in the corresponding clauses of the other parts, thus ensuring that each document can be used on a "stand-alone" basis.

Clause 4 describes the network sub-systems applicable to broadband infrastructures and their interconnections that are addressed by the ETSI EN 305 174 series.

Clause 5 specifies the format of the other parts of the ETSI EN 305 174 series (other than ETSI EN 305 174-8 [i.6]).

Document History

EN 305 174-1
February 1, 2018
Access, Terminals, Transmission and Multiplexing (ATTM); Broadband Deployment and Lifecycle Resource Management; Part 1: Overview, common and generic aspects
The present document is part 1 of a multi-part deliverable which specifies the general engineering of various broadband infrastructures to enable the most effective energy management (and management...
November 1, 2017
Access, Terminals, Transmission and Multiplexing (ATTM); Broadband Deployment and Lifecycle Resource Management; Part 1: Overview, common and generic aspects
The present document is part 1 of a multi-part deliverable which specifies the general engineering of various broadband infrastructures to enable the most effective energy management (and management...

References

Advertisement