scope:
Introduction
This track work information (TWI) sheet explains how to maintain Insulated Block Joints (IBJs), also known as Insulated Rail Joints.
This job covers
- Scoping the work
- Associated works
- T-piece resin repair
- Disassembly
- Cleaning the joint
- Grinding off lipping
- Joint assembly
- Use of the Tenconi end post and Elmotherm FS 190 Resin Sealer
See also:
Appendix A for IBJ Inspection / Scoping form TEF3205
Appendix B for Pads, insulators and clip configuration
Document History
NR TWI 2C027�2G032
June 1, 2013
How to Maintain Insulated Block Joints
Introduction
This track work information (TWI) sheet explains how to maintain Insulated Block Joints (IBJs), also known as Insulated Rail Joints.
This job covers
Scoping the work
Associated works...