NR TWI 2T014
How to Lift and Pack S&C
| Organization: | NR |
| Publication Date: | 1 March 2005 |
| Status: | active |
| Page Count: | 4 |
scope:
Introduction
This Track Work Instruction covers how to correct single top or twist fault in simple S&C. The actual packing processes are similar to those used on plain line and so this TWI only describes the additional factors you need to consider when lifting and packing S&C.
See also other TWIs that provide details of packing methods:
TWI 2T007 How to carry out measured shovel packing
TWI 2T010 How to carry out kango packing
There are separate instructions covering most aspects of S&C maintenance. These are listed at the end of this TWI.
Document History