NR TWI 3B016
How to Regulate Ballast by Machine
| Organization: | NR |
| Publication Date: | 1 March 2005 |
| Status: | active |
| Page Count: | 2 |
scope:
Introduction
This Track Work Instruction covers how to plan ballast regulating by machine. This includes on ballast regulators and road/rail vehicles fitted with equipment attached to their jibs.
The use of this type of equipment is a valuable resource that eliminates the use of considerable amounts of manpower.
See also separate instructions:
TWI 3B004 How to plan ballast regulation
TWI 3B014 How to prepare track for the ballast regulator
Document History