NR TWI 3G008

How to Manage a Change in Traffic

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 March 2005
Status: active
Page Count: 2
scope:

Introduction

This Track Work Instruction covers how to prepare for the introduction of new rolling stock on a route.

Normally, specialists (such as gauging engineers) carry out this type of clearance, but this TWI gives guidance on the physical works that may need to be carried out along with some maintenance considerations.

See also separate instructions:

TWI 3G006 How to manage permanent increases in line speed

TWI 4G003 How to manage an increase in tonnage

TWI 4G004 How to manage a change of rolling stock/traction

TWI 4G005 How to manage temporary experimental increases in line speed

Document History

NR TWI 3G008
March 1, 2005
How to Manage a Change in Traffic
Introduction This Track Work Instruction covers how to prepare for the introduction of new rolling stock on a route. Normally, specialists (such as gauging engineers) carry out this type of...