NEN-EN 16907-3

Earthworks - Part 3: Construction procedures

pending, Most Current
Organization: NEN
Publication Date: 1 December 2015
Status: pending
Page Count: 96
ICS Code (Earthworks. Excavations. Foundation construction. Underground works): 93.020
scope:

This European Standard presents execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures. It includes excavation and placement of rock materials underwater. Dredging of soils and the associated hydraulic placement of fills are covered by Part 6 of this standard. Execution of earthworks follows the conclusions of the earthworks design and optimization phase (Part 1), which should anticipate soil and rock specificities and their suitability. In case some events could not be foreseen, additional design is performed during the execution of works.

Document History

NEN-EN 16907-3
December 1, 2015
Earthworks - Part 3: Construction procedures
This European Standard presents execution procedures for excavating, transporting and placing soils and rocks for the construction of earth-structures. It includes excavation and placement of rock...
Advertisement