UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN 12952-9

Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuel for the boiler

inactive
Organization: NEN
Publication Date: 1 July 1999
Status: inactive
Page Count: 27
ICS Code (Gas and steam turbines. Steam engines): 27.040
scope:

This European Standard applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized fuel storage system and ends at the ash extraction plant. For multifuel firing systems using separate or combined burners, these requirements apply to the pulverized fuel firing part involved. For other fuels or firing systems used in combination, other requirements apply e.g. EN 12952-8. These requirements cover the use of pulverized fuels originating from coal ranging from low to high volatile matter content. This includes e.g. coke, anthracite, bituminous coal or hard coal, lignite or brown coal, petrol coke and oil shale. Requirements for operational equipment apply for steam boilers and hot water generators with permanent supervision by properly trained persons. As firing systems using pulverized fuel may be designed either as direct-firing or as indirect-firing systems, operational requirements have to be differentiated. Annex A summarizes the operational requirements for firing systems including the pulverizing system. A pulverizing system is bounded by: - the outlet of the fuel bunkers feeding the mill; - the outlet of the burners fed from that mill;- the points at which the hot air or flue gas and tempering air or flue gas leave their main supply ducts including the primary air fan if associated individually with the mill. involved. Fot other fuels or firing systems used n combination, other requirements apply e.g. EN 12952-8.

Document History

November 1, 2022
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
Firing systems This document applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized...
February 1, 2020
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
Firing systems This document applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized...
February 1, 2003
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
This European Standard applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized fuel...
NEN-EN 12952-9
July 1, 1999
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuel for the boiler
This European Standard applies to pulverized fuel firing systems of steam boilers and hot water generators and commences at the filling equipment for the boiler bunkers or for the pulverized fuel...

References

Advertisement