UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN-ISO 15876-2/A1

Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 2: Pipes

inactive
Organization: NEN
Publication Date: 1 June 2007
Status: inactive
Page Count: 10
ICS Code (Water supply systems): 91.140.60
ICS Code (Plastics pipes): 23.040.20

Document History

January 1, 2021
Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 2: Pipes
A description is not available for this item.
February 1, 2017
Plastics piping systems for hot and cold water installations - Polybutene (PB) - Part 2: Pipes
NEN-EN-ISO 15876-2 specifies the characteristics of pipes for polybutene-1 (PB-1) piping systems intended to be used for hot and cold water installations within buildings for the conveyance of water...
NEN-EN-ISO 15876-2/A1
June 1, 2007
Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 2: Pipes
A description is not available for this item.
February 1, 2006
Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 2: Pipes
A description is not available for this item.
May 1, 2004
Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 2: Pipes
This Part of EN ISO 15876 specifies the characteristics of pipes made of polybutylene (PB) for piping systems intended to be used for hot and cold water installations within buildings for the...
Advertisement