UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN-ISO 10427-2

Petroleum and natural gas industries - Equipment for well cementing - Part 2: Centralizer placement and stop-collar testing

inactive
Organization: NEN
Publication Date: 1 February 2003
Status: inactive
Page Count: 24
ICS Code (Exploratory, drilling and extraction equipment): 75.180.10
scope:

This part of ISO 10427 provides calculations for determining centralizer spacing, based on centralizer performance and desired standoff, in deviated and dogleg holes in wells for the petroleum and natural gas industries. It also provides a procedure for testing stop collars and reporting test results.

Document History

June 1, 2004
Petroleum and natural gas industries - Equipment for well cementing - Part 2: Centralizer placement and stop-collar testing
This part of ISO 10427 provides calculations for determining centralizer spacing, based on centralizer performance and desired standoff, in deviated and dogleg holes in wells for the petroleum and...
NEN-EN-ISO 10427-2
February 1, 2003
Petroleum and natural gas industries - Equipment for well cementing - Part 2: Centralizer placement and stop-collar testing
This part of ISO 10427 provides calculations for determining centralizer spacing, based on centralizer performance and desired standoff, in deviated and dogleg holes in wells for the petroleum and...
Advertisement