NEN-EN 1536
Execution of special geotechnical work - Bored piles
inactive
| Organization: | NEN |
| Publication Date: | 1 March 1999 |
| Status: | inactive |
| Page Count: | 87 |
| ICS Code (Earthworks. Excavations. Foundation construction. Underground works): | 93.020 |
scope:
This standard establishes general principles for the construction of piles - which are formed in the ground by excavation and - which contain a structural member to transfer loads and or limit deformations. Covers - piles with circular shape and - piles with barrette shape, provided the section is concreted in a single operation.
Document History
June 1, 2015
Execution of special geotechnical work - Bored piles
NEN-EN 1536 establishes general principles for the execution of bored piles.
November 1, 2014
Execution of special geotechnical work - Bored piles
A description is not available for this item.
September 9, 2010
Execution of special geotechnical work - Bored piles
This European Standard establishes general principles for the execution of bored piles (see 3.2).
February 1, 2009
Execution of special geotechnical work - Bored piles
This European Standard establishes general principles for the execution of bored piles (see 3.2).
NEN-EN 1536
March 1, 1999
Execution of special geotechnical work - Bored piles
This standard establishes general principles for the construction of piles - which are formed in the ground by excavation and - which contain a structural member to transfer loads and or limit...
August 1, 1994
Execution of special geotechnical work - Bored piles
This standard establishes general principles for the construction of piles - which are formed in the ground by excavation and - which contain a structural member to transfer loads and or limit...