UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN 50123-2

Railway applications - Fixed installations - D.C. switchgear - Part 2: D.C. circuit breakers

inactive
Organization: NEN
Publication Date: 1 August 1995
Status: inactive
Page Count: 36
ICS Code (Railway engineering in general): 45.020
scope:

This part two of the EN 50123 covers D.C. circuit breakers used in stationary installations of traction systems. Switchboard and distributions are covered by part six; therefore this part two contains only some requirements concerning enclosures for circuit breakers, which are to be brought to the attention in the design, manufacture and testing of circuit breakers themselves. EMC requirements are covered by EN 50121-5 and additional requirements concerning dependability (RAMS) are covered by EN 50126.

Document History

April 1, 2003
Railway applications - Fixed installations - D.C. switchgear - Part 2: D.C. circuit breakers
This part of EN 50123 series specifies requirements for d.c. circuit breakers for use in fixed installations of traction systems.
December 1, 2001
Railway applications - Fixed installations - D.C. switchgear - Part 2: D.C. circuit breakers
This part of EN 50123 series specifies requirements for d.c. circuit breakers for use in fixed installations of traction systems.
October 1, 1996
Railway applications - Fixed installations - D.C. switchgear - Part 2: D.C. circuit breakers
A description is not available for this item.
NEN-EN 50123-2
August 1, 1995
Railway applications - Fixed installations - D.C. switchgear - Part 2: D.C. circuit breakers
This part two of the EN 50123 covers D.C. circuit breakers used in stationary installations of traction systems. Switchboard and distributions are covered by part six; therefore this part two...
Advertisement