NEN 10965

Supplementary control points for reactor shutdown without access to the main control room

inactive, Most Current
Organization: NEN
Publication Date: 1 November 1989
Status: inactive
Page Count: 24
ICS Code (Nuclear power plants. Safety): 27.120.20
scope:

This standard establishes the requirements for Supplementary Control Points (SCP) provided to enable the operating staff to shut down the ractor and maintain the plant in a safe shut-down condition when the main control room is no longer available. This standard covers the functional selection, design and organization of the man/machine interface. It also establishes requirements for procedures which systematically verify and validate the functional design of SCP.

Document History

NEN 10965
November 1, 1989
Supplementary control points for reactor shutdown without access to the main control room
This standard establishes the requirements for Supplementary Control Points (SCP) provided to enable the operating staff to shut down the ractor and maintain the plant in a safe shut-down condition...