UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN 12699

Execution of special geotechnical work - Displacement piles

inactive
Organization: NEN
Publication Date: 1 May 2013
Status: inactive
Page Count: 61
ICS Code (Earthworks. Excavations. Foundation construction. Underground works): 93.020
scope:

NEN-EN 12699 establishes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave and/or limiting vibration as well as removal of obstructions or to assist penetration. Piles are driven into the ground using impact, vibration, pressing, screwing or a combination of these methods. The material of displacement piles covered by this European Standard can be: - steel; - cast iron; - concrete, mortar; - timber; - grout; - combination of above. This European Standard covers prefabricated, cast in situ, or a combination of these methods to form displacement piles of regular shape. Examples are given in Figure A.2 and Figure A.3. Displacement piles may be installed in soils enhanced by ground improvement techniques. The ground improvement can be executed before, at the same time or after installation of the piles. Other than practical considerations there are for the purpose of this European Standard no limitations regarding cross section dimensions, shaft or base enlargements, length or rake. The provisions of this European Standard apply to: - single piles; - pile groups; - concrete sheet piles. Columns constructed by ground improvement techniques (such as mixed in situ columns, jet grouting, compaction grouting, vibro flotation, stone columns) are not covered by this European Standard. Bored piles are covered in EN 1536. Steel and timber sheet pile walls are covered in EN 12063. Micropiles are covered in EN 14199.

Document History

May 1, 2015
Execution of special geotechnical works - Displacement piles
NEN-EN 12699 establishes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground...
NEN-EN 12699
May 1, 2013
Execution of special geotechnical work - Displacement piles
NEN-EN 12699 establishes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground...
January 1, 2001
Execution of special geotechnical work - Displacement piles
Establishes general principles for the execution of displacement piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave,...
January 1, 2001
Execution of special geotechnical work - Displacement piles
Establishes general principles for the execution of displacement piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave,...
January 1, 1997
Execution of special geotechnical work - Displacement piles
Establishes general principles for the execution of displacement piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave,...
Advertisement