UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/GN/TRK/8001

Index of Track Bowties

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 June 2018
Status: active
Page Count: 12
scope:

This Network Rail document comprises a controlled list of Track bowties. Each bowtie is shown expanded at three different levels:

a) top event, threats and consequences only ('level 1');

b) as in (a) but expanded to show controls, including control type and accountable roles ('level 2'); and

c) as in (b) but expanded again to show control documents (e.g. standards) mapped to controls ('level 3').

Bowties are used to:

a) visually demonstrate the level of control Network Rail has over a specified risk;

b) support the identification of improvements to existing controls to manage risk more effectively; and

c) support the identification of the standards and control documents required to support the control of risk.

Purpose

This document provides the index and version control to the Track Bowties, diagrams that are used to visualise how risks are managed.

Document History

NR/GN/TRK/8001
June 2, 2018
Index of Track Bowties
This Network Rail document comprises a controlled list of Track bowties. Each bowtie is shown expanded at three different levels: a) top event, threats and consequences only (‘level 1’); b) as in...

References

Advertisement