NR/L2/SIG/11201/MOD A4-5
Signalling Design Handbook: Switch and Crossing (S&C) Plans
| Organization: | NR |
| Publication Date: | 2 June 2018 |
| Status: | active |
| Page Count: | 7 |
scope:
The scope of this module covers the content that the signal design engineer either provides or requires on S&C plans produced by the permanent way engineer. It applies to all projects providing new or altered S&C arrangements on Network Rail infrastructure.
Purpose
The purpose of this module is to contribute to the sharing of project information between disciplines to produce a multi-discipline solution.
Document History