UNLIMITED FREE ACCESS TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - OPNAV 3501.199C

(N42) REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE T-AKR FAST SEALIFT SHIP (FSS), LARGE MEDIUM SPEED RO/RO (LMSR), AVIATION SUPPORT SHIPS (T-AVB), AUXILIARY CRANE SHIP (T-ACS), AND READY RESERVE FORCE (RRF) DRY CARGO SHIPS

inactive
Organization: NAVY
Publication Date: 17 December 2007
Status: inactive
Page Count: 15
scope:

Purpose.

To issue the Required Operational Capabilities (ROC) and Projected Operational Environment (POE) for the Strategic Sealift Ships to include the T-AKR Fast Sealift Ships (FSS), Large Medium Speed RO/RO (LMSR), Aviation Support Ships (T-AVB), Auxiliary Crane Ships (T-ACS), and Ready Reserve Force (RRF) Dry Cargo Ships. RRF ships include Dry Cargo, FSS, T-AVB, T-ACS, Lighter Aboard Ship (LASH), SEABEE, and Modular Cargo Delivery System (MCDS) Breakbulk ships.

Document History

March 4, 2022
(N4L) REQUIRED OPERATIONAL CAPABILITIES AND PROJECTED OPERATIONAL ENVIRONMENT FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE, ROLL-ON AND ROLL-OFF SHIPS AND AUXILIARY CRANE SHIPS
Scope and Applicability. Per reference (a), enclosures (1) and (2) define the ROC and POE for the strategic sealift ships. Strategic sealift ships are U.S. Government-owned ships, manned by civilian...
OPNAV 3501.199C
December 17, 2007
(N42) REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE T-AKR FAST SEALIFT SHIP (FSS), LARGE MEDIUM SPEED RO/RO (LMSR), AVIATION SUPPORT SHIPS (T-AVB), AUXILIARY CRANE SHIP (T-ACS), AND READY RESERVE FORCE (RRF) DRY CARGO SHIPS
Purpose. To issue the Required Operational Capabilities (ROC) and Projected Operational Environment (POE) for the Strategic Sealift Ships to include the T-AKR Fast Sealift Ships (FSS), Large Medium...
May 7, 1998
(N422) REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE T-AKR FAST SEALIFT SHIP (FSS), LARGE MEDIUM SPEED RO/RO (LMSR), AVIATION SUPPORT SHIPS (T-AVB), AUXILIARY CRANE SHIP (T-ACS), AND
A description is not available for this item.
November 8, 1993
(N422) REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE T-AKR FAST SEALIFT SHIP (FSS), LARGE MEDIUM SPEED RO/RO (LMSR), AVIATION SUPPORT SHIPS (T-AVB), AUXILIARY CRANE SHIP (T-ACS), AND
A description is not available for this item.
January 5, 1989
(N422) REQUIRED OPERATIONAL CAPABILITIES (ROC) AND PROJECTED OPERATIONAL ENVIRONMENT (POE) FOR STRATEGIC SEALIFT SHIPS TO INCLUDE THE T-AKR FAST SEALIFT SHIP (FSS), LARGE MEDIUM SPEED RO/RO (LMSR), AVIATION SUPPORT SHIPS (T-AVB), AUXILIARY CRANE SHIP (T-ACS), AND
A description is not available for this item.
Advertisement