ARMY - UFGS-31 32 23

FOUNDATION DRILLING AND GROUTING

inactive, Most Current
Organization: ARMY
Publication Date: 1 August 2008
Status: inactive
Page Count: 28
scope:

NOTE:

This guide specification covers the requirements for drilling exploratory holes; drilling drain holes; drilling, washing and pressure testing grout holes; making grout connections; furnishing, handling, transporting, storing, mixing and injecting the grouting materials; patching the finished grout holes; care and disposal of drill cuttings, waste water and waste grout; clean-up grout galleries and shafts and areas upon completion of the work and all such other operations as are incidental to the drilling and the grouting.

Document History

UFGS-31 32 23
August 1, 2008
FOUNDATION DRILLING AND GROUTING
NOTE: This guide specification covers the requirements for drilling exploratory holes; drilling drain holes; drilling, washing and pressure testing grout holes; making grout connections; furnishing,...