LUL - G-008
Verification Activity Plan - Guide & Template
| Organization: | LUL |
| Publication Date: | 1 October 2007 |
| Status: | inactive |
| Page Count: | 16 |
scope:
This document provides guidance on the production of a VAP to manage LU Directorates' assurance requirements throughout the lifecycle of a proposed change, contract or maintenance activity including, should it be determined necessary, requirements for a safety verification scheme under the Railways and Other Guided Transport Systems (Safety) Regulations 2006.
This Manual replaces 5-01002-016 A1. The Manual has been re formatted and renumbered. There were no technical changes.
Purpose
LU has determined that a Verification Activity Plan (VAP) will be produced documenting LU's intended verification activities to gain assurance throughout the lifecycle of a proposed change, contract or maintenance activity.
This document aims to provide guidance on the identification of verification requirements and the contents of a VAP for a particular work activity.
Document History