LUL - 1-112
Load Planning Requirements (for Electrical and Compressed Air forecasting)
| Organization: | LUL |
| Publication Date: | 1 October 2007 |
| Status: | inactive |
| Page Count: | 16 |
scope:
This Standard defines the requirement for the production of load plans by the Infracos and Direct Users.
This Standard applies to all future planned projects and activities that impact on the electrical power or compressed air load on the Powerlink system.
This Standard shall be used by those concerned with identifying or planning replacement, refurbishment or upgrades to electrical power or compressed air supply equipment.
This standard replaces 2-01303-061 A1. The Standard has been re formatted and renumbered. There were no technical changes.
Purpose
The purpose of this Standard is to define the load planning requirements of the Infracos and Direct Users.
This Standard aims to ensure that the Annual Loading Plans are produced in such a way that they meet the requirements of LU and the Power Services Contractor.
The business objective of load planning is to provide the information necessary to enable Powerlink to undertake Capacity Planning on the Powerlink system.
Document History