UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

AIAA - S-102.1.5

Performance-Based Failure Review Board (FRB) Requirements

inactive
Organization: AIAA
Publication Date: 1 January 2009
Status: inactive
Page Count: 37
scope:

This document, when followed in its entirety, will yield a robust EPS design suitable for very high-reliability space missions. This document specifies general design practices and sets minimum verification and validation requirements for power systems of unmanned spacecraft. The focus of the document is on earth orbiting satellites using traditional photovoltaic/battery power, but does not exclude other primary power generation and storage methods. This document does not address specific launch vehicle requirements however much of the design philosophy used here is applicable to launch vehicle power systems.

Document History

January 1, 2019
Performance-Based Failure Review Board (FRB) Requirements
This standard establishes uniform requirements and criteria for a performance-based Failure Review Board (FRB). The performance-based aspect of this standard requires that the organizationʼs FRB...
S-102.1.5
January 1, 2009
Performance-Based Failure Review Board (FRB) Requirements
This document, when followed in its entirety, will yield a robust EPS design suitable for very high-reliability space missions. This document specifies general design practices and sets minimum...

References

Advertisement