UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

ATIS - 0300013

Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment B ISUP Compatibility Tests

inactive
Organization: ATIS
Publication Date: 1 February 2009
Status: inactive
Page Count: 85
scope:

INTRODUCTION

These tests scripts were developed as a minimum set of tests to be performed during interconnection of two networks.

These tests presume that the interconnected network elements have been tested for conformance to applicable standards. Since no suite of conformance tests has been adopted, in the interest of the service, the interconnecting parties should exchange known specification non-compliances and discuss conformance testing that they have performed.

Because of the current lack of conformance tests, interconnecting networks may agree on additional tests to be performed.

NOTE: The test message sequence and expected test results described below are applicable to interconnecting trunk groups FG-D type interconnections and can also accommodate wireline to wireless, LEC to LEC interconnections. For all other types, it is expected that the call shall complete as per standards. The interconnecting parties should discuss all parameters and codings prior to testing taking place.

Purpose of Tests

This document provides a recommended minimum set of script-driven tests and manually interactive tests that should be performed to test the compatibility of the network elements.

Document History

December 1, 2011
Next Generation Interconnection Interoperability (NGIIF) Reference Document: Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment B ISUP Compatibility Tests
Purpose of Tests This document provides a recommended minimum set of script-driven tests and manually interactive tests that should be performed to test the compatibility of the network elements.
June 1, 2009
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment B ISUP Compatibility Tests
Purpose of Tests This document provides a recommended minimum set of script-driven tests and manually interactive tests that should be performed to test the compatibility of the network elements.
0300013
February 1, 2009
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment B ISUP Compatibility Tests
INTRODUCTION These tests scripts were developed as a minimum set of tests to be performed during interconnection of two networks. These tests presume that the interconnected network elements have...
January 1, 2008
Network Interconnection Interoperability (NIIF) Reference Document Part III, Installation, Testing and Maintenance Responsibilities for SS7 Links and Trunks Attachment B ISUP Compatibility Tests
INTRODUCTION These tests scripts were developed as a minimum set of tests to be performed during interconnection of two networks. These tests presume that the interconnected network elements have...
Advertisement