PIP ELSSG03

Design and Fabrication of Medium Voltage Metal-Enclosed Load Interrupter Switchgear

inactive
Buy Now
Organization: PIP
Publication Date: 1 October 2009
Status: inactive
Page Count: 19
scope:

This Practice describes minimum requirements for design, performance, inspection, testing, and documentation, for delayed transfer automatic transfer systems (ATS) for two-source secondary selective substations. ATS provides automatic restoration of bus voltage upon loss of one of the sources. This Practice also covers remote monitoring and control requirements. This Practice does not cover fast transfer or delayed in-phase transfer systems.

Purpose

This Practice provides requirements for automatic transfer systems for two-source secondary selective substations.

Document History

January 1, 2016
Design and Fabrication of Medium Voltage Metal-Enclosed Load Interrupter Switchgear
This Practice describes the requirements for design, fabrication, inspection, testing, and shipment of medium voltage metal-enclosed load interrupter switchgear for installation in non-classified...
PIP ELSSG03
October 1, 2009
Design and Fabrication of Medium Voltage Metal-Enclosed Load Interrupter Switchgear
This Practice describes minimum requirements for design, performance, inspection, testing, and documentation, for delayed transfer automatic transfer systems (ATS) for two-source secondary selective...