NASA-LLIS-0010

Lessons Learned - Repair of a Failed Component (Shuttle Orbiter General Purpose Computer Hardware Interface Soldered Pin) Before Investigation of the Cause of the Failure

active, Most Current
Organization: NASA
Publication Date: 17 June 1991
Status: active
Page Count: 2
scope:

Description of Driving Event:

A shuttle orbiter General Purpose Computer (GPC) at Input Output Port (IOP) No.2 was voted out of a set with other computers. The computers were exchanged and the computer connected at IOP No.2 also malfunctioned, indicating the problem was with the IOP. A pin solder joint was found to be fractured. The unit was repaired without investigating the cause of the joint failure. Rework procedures were revised to require an investigation of the cause of a failure before any attempt to repair the failed component.

Document History

NASA-LLIS-0010
June 17, 1991
Lessons Learned - Repair of a Failed Component (Shuttle Orbiter General Purpose Computer Hardware Interface Soldered Pin) Before Investigation of the Cause of the Failure
Description of Driving Event: A shuttle orbiter General Purpose Computer (GPC) at Input Output Port (IOP) No.2 was voted out of a set with other computers. The computers were exchanged and the...