UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NASA-LLIS-0050

Lessons Learned - Delta Wiring Harness Connectors and Installation

active, Most Current
Organization: NASA
Publication Date: 24 December 1991
Status: active
Page Count: 2
scope:

Description of Driving Event:

Premature shutdown of the main and vernier engines occurred as a result of an electrical malfunction in the vehicle's power bus, specifically a short circuit to ground. A Mishap Board investigation concluded the most probable cause of the failure was flight vibration that induced mechanical damage to wiring insulation resulting in a short to ground.

Document History

NASA-LLIS-0050
December 24, 1991
Lessons Learned - Delta Wiring Harness Connectors and Installation
Description of Driving Event: Premature shutdown of the main and vernier engines occurred as a result of an electrical malfunction in the vehicle's power bus, specifically a short circuit to ground....
Advertisement