scope:
Description of Driving Event:
December 9, 1982, the 80 x 120 foot wind tunnel at the Ames
Research Center was undergoing commissioning/shaked
Document History
NASA-LLIS-0495
February 28, 1983
Lessons Learned - Systems Engineering, System Safety and R&QA Program Integration, Operational Safety and Performance, Risk Management, and Facility Safety Inspections
Description of Driving Event:
December 9, 1982, the 80 x 120 foot wind tunnel at the Ames Research Center was undergoing commissioning/shakedown testing when Vane Set 5 collapsed destroying the vane...