NASA-LLIS-0432

Lessons Learned – Mars Observer (MO) TWTAs Were Not Qualified (while powered) for Pyrotechnic Shock (1993)

active, Most Current
Organization: NASA
Publication Date: 17 July 1996
Status: active
Page Count: 3
scope:

Abstract:

The MO Traveling Wave Tube Amplifiers (TWTAs) were not powered during qualification Pyrotechnic Shock testing. As a result, the TWTA beam and cathode heaters were not powered during the critical MO tank pressurization to allow real time telemetry during this critical event. Fully consider the cost/risk tradeoff of not qualifying critical inherited designs for new operational uses.

Document History

NASA-LLIS-0432
July 17, 1996
Lessons Learned – Mars Observer (MO) TWTAs Were Not Qualified (while powered) for Pyrotechnic Shock (1993)
Abstract: The MO Traveling Wave Tube Amplifiers (TWTAs) were not powered during qualification Pyrotechnic Shock testing. As a result, the TWTA beam and cathode heaters were not powered during the...