UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NASA-LLIS-0121

Lessons Learned - Orbiter Vehicle (OV) Hydrogen (H2) Tank Removal

active, Most Current
Organization: NASA
Publication Date: 18 August 1992
Status: active
Page Count: 2
scope:

Description of Driving Event:

During removal of the H2 tank from the OV-104 mid-body, a crane was used to take up the initial cable slack and transfer the load from the tank struts to the GSE lifting fixture. The move director called for a crane movement of "up at 1 in/sec" and the crane controller relayed the command to the crane operator. The actual lift rate was on the order of "up at 3 in/sec" and a momentary vertical load of 800 lbs was applied to the tank assembly. This load was immediately reduced and the tank bolts removed. The normal transfer load is made up of a 150 lb tank lifting fixture and a 235 lb tank weight.

Document History

NASA-LLIS-0121
August 18, 1992
Lessons Learned - Orbiter Vehicle (OV) Hydrogen (H2) Tank Removal
Description of Driving Event: During removal of the H2 tank from the OV-104 mid-body, a crane was used to take up the initial cable slack and transfer the load from the tank struts to the GSE...