NASA-LLIS-0353

Lessons Learned - Facility Failure During Testing of the Galileo Near Infrared Mapping Spectrometer (NIMS)

active, Most Current
Organization: NASA
Publication Date: 9 December 1994
Status: active
Page Count: 3
scope:

Abstract:

During a recalibration test of the Galileo NIMS flight instrument in a subsystem vacuum chamber, a facility failure subjected it to subjected to a temperature below its qualification limits. Subsystem facilities must be critically examined for the probability of any failure modes which may subject flight hardware to out-of-specification environments. Specification limits should be alarmed, and there should be straightforward safing procedures available to the operator.

Document History

NASA-LLIS-0353
December 9, 1994
Lessons Learned - Facility Failure During Testing of the Galileo Near Infrared Mapping Spectrometer (NIMS)
Abstract: During a recalibration test of the Galileo NIMS flight instrument in a subsystem vacuum chamber, a facility failure subjected it to subjected to a temperature below its qualification...